Background
This is an ongoing contract with Apache that has been in place
since 2012. DSL complete a broad spectrum of scopes across
their assets in the Northern North Sea ranging from asset integrity remedial scopes through to Drilling structure removal and
upgrades.
DSL have established a long term working relationship with Apache to a point where DSL have personnel on board Apache assets most of the year.
And although our teams mobilised for a specific scope of work, during weather or operational downtime our operatives will work with the client on other Integrity work-scopes on the asset so there were minimum non-productive hours expended for DSL personnel.
Personnel supplied is as below:
- Rope Access Welders
- Rope Access Platers
- Rope Access Riggers
- Rope Access Pipefitters
- Rig-builders
Project description:
The work scope involved numerous work tasks in what were challenging conditions;
- Onshore Project Management
- Derrick Survey and structural analysis
- Engineering & Fabrication
- Asset Integrity Scopes
- Mechanical, E&I Abandonment
- Offshore Construction Services
- Rope Access Personnel
- Derrick structure removal
- Traveling equipment removal
- Process simplification
Services provided
The work scope involved numerous work tasks in what were challenging conditions;
- Project Planning
- Engineering and Fabrication
- Rope access Personnel and Equipment
- Offshore Construction / Asset Integrity Services
- Redundant Equipment Removal
- Decommissioning
Benefits to the client
The work scope involved numerous work tasks in what were challenging conditions;
- Multi-disciplined personnel creating efficiencies & the ability to work on other work sites during bad weather
- Collaborative approach between Client, DSL and Rig Crew
- Open discussions leading to innovative ideas resulting in cost and time efficiencies
- Open sharing of Information between all parties